Item |
Project Name |
Main Activities |
|
Construction Area(Sq.m.) |
Remarks |
FACTORY BUILDING |
|
|
|
|
|
1. |
CELESTICA THAILAND PROJECT (ELECTRONIC FACTORY) |
CSA + M & E |
|
40,000.00 |
Electronic Factory |
|
(FACTORY & OFFICE BUILDING) |
|
|
|
|
2 |
CELESTICA FACTORY II PROJECT (ELECTRONIC FACTORY) |
CSA + M & E |
|
36,000.00 |
Electronic Factory |
3 |
STARS MICROELECTRONICS NEW FACTORY |
CSA + M & E |
|
- |
Factory Building & Office Building |
|
(FACTORY & OFFICE BUILDING) |
|
|
|
|
4 |
STANLEY WORK FACTORY |
CSA + M & E |
|
13,790.00 |
Factory & Office Building (Turkey Project) |
5 |
AAPICO - HITECH CO., LTD. |
CSA |
|
12,000.00 |
Factory Bldg. (Automotive Part) |
|
- AAPICO - HITECH FACTORY BUILDING |
|
|
|
Office Bldg. 5 Stories. |
|
- AAPICO - HITECH OFFICE BUILDING |
|
|
|
6 |
ABLE ARVIN AND ABLE SANIT FACTORY |
CSA |
|
- |
Factory Bldg. (Automotive Part) |
7 |
P&G GSS PROJECT INCLUDE SITE PREPATATION |
CSA + M & E + |
|
- |
Liquid Plant |
|
(Under LGMEI (Thailand) Co., Ltd.) |
Equipment Installation |
|
|
|
8 |
P&G FEMPRO PROJECT |
CSA + M &e |
|
- |
Female Protection Product |
|
(Under LGMEI (Thailand) Co., Ltd.) |
|
|
- |
|
9 |
P&G JADE STORAGE TANK PROJECT |
CSA + M & E + |
|
- |
Extension of GSS Plant (Liquid Plant) |
|
(Under LGMEI (Thailand) Co., Ltd.) |
Equipment Installation |
|
|
|
10 |
P&G NEW LABORATORY |
CSA + M & E |
|
|
Turnkey Project |
11 |
CHEMDAL S.E.A. PLANT REYONG |
CSA |
|
12,000.00 |
Factory Building (Produce Super Absorber Polymer : SAP) |
12 |
NATIONAL STARCH AND CHEMICAL (THAILAND) |
|
|
- |
|
|
- Dryer #5 and Packing Tower at Rayong Plant |
CSA |
|
|
Factory Building (Food Plant) |
|
-Factory Expansion Phase II at Kalasin Plant |
CSA |
|
|
Factory Building (Food Plant) |
13 |
CHOK CHAI DAIRY PLANT EXTENSION |
CSA + M & E |
|
5,500.00 |
Milk Factory |
14 |
DARAMIC THAILAND NEW FACTORY |
CSA + M &E |
|
4,000.00 |
Factory Building |
15 |
KIMBERY CLARK (PATHUMTHANI) EXTENTSION 2001 |
CSA + M & E |
|
- |
Factory Building |
16 |
OHCT'S PLANT MODIFICATION # 2 |
CSA |
|
- |
Factory Building |
17 |
EFFEM 2001 PROJECT |
CSA + M & E |
|
- |
Food Factory |
18 |
HONEYWELL NEW PLANT |
CSA + M & E |
|
- |
Fitting Factory |
19 |
S.SILPA OFFICE AND FACTORY |
CSA + M & E |
|
16688.57 |
Factory Building |
20 |
CANADOIL ASIA FACTORY & CANADOIL PIPE FACTORY & CANADOIL |
|
|
|
Factory Building (Product Fitting & Piping |
|
COATING |
|
|
|
components for natural gas pipe line) |
|
- CANADOIL ASIA |
CSA + M & E |
|
|
|
|
- MACHINE SHOP |
CSA + M & E |
|
|
|
|
- FORMING SHOP AND WELDING SHOP CANADOIL PIPE FACTORY |
CSA + M & E |
|
|
|
|
- FINISHING ,BEVELING AND TESTING SHOP CANADOIL PIPE FACTORY |
CSA + M & E |
|
16,700.00 |
|
|
- ADDITIONAL OF BEVELING, TESTING & FINISHING SHOP |
CSA + M & E |
|
|
|
21 |
SA, PA, WA, SE SHOP CANADOIL ASIA FACTORY PROJECT |
CSA + M & E |
|
- |
Factory Building |
22 |
ADDITIONAL OF BEVELING, TESTING & FINISHING SHOP PROJECT |
CSA + M & E |
|
- |
Factory Building |
23 |
SUWANNAPHOOME WASTE WATER TREATMENT PLANT |
CSA + M & E |
|
- |
Distillery Factory |
24 |
PLATFORM EXTRACTION AND EVAPORATION BUILDING, |
CSA |
|
- |
Nestle Factory Building Renovatio |
|
PHED PROJECT |
|
|
|
(Suwinthawong Rd.) |
25 |
MPO OFFICE AND WAREHOUSE PHASE 1 AND |
CSA + M & E |
|
- |
Factory Building & Warehouse Building |
|
RENOVATION FOR MPO OFFICE |
|
|
|
|
26 |
THAI ASIA P.E. PIPE NEW FACTORY |
CSA + M & E |
|
- |
Factory Building & Office Building |
27 |
K.INTERNATIONAL PACKAGING FACTORY |
CSA |
|
- |
Factory Bldg. (Plastic Bag for Export) |
28 |
PREUKSA P.C. PLANT , LAMLUKKA |
|
|
- |
Preuksa P.C. Plant No.1 for Precast Factory |
|
- PREUKSA P.C. PLANT 1, LAMLUKKA FOR STAGE 1 - PILING WORK |
Piling Work |
|
|
|
|
- PREUKSA P.C. PLANT 1, lAMLUKKA FOR STAGE 2 |
CSA + M & E |
|
|
|
29 |
SUPER T. FOOD NEW FACTORY |
CSA |
|
- |
Food Factory |
30 |
NEW FACTORY AND OFFICE BUILDING SEETHONG 555 CO., LTD. |
CSA + M & E |
|
- |
Factory Building & Office Building |
31 |
SALEE INDUSTRY NEW FACTORY PATHUMTHAN |
CSA + M & E |
|
- |
Factory Building & Office Building |
32 |
TANA NETTING PROJECT |
CSA + M & E |
|
- |
Factory Building |
33 |
THE ECPORT SOAP FINSHING BUILDING (PZ CUSSON) |
CSA |
|
- |
Factory & Office Building |
34 |
TOZEN FACTORY |
CSA + M & E |
|
- |
Factory & Office Building (Turnkey Project) |
35 |
DANIELI FAR EAST LTD |
|
|
- |
Factory & Office Building |
|
- DANIELI FACTORY PHASE I (2005) |
CSA + M & E |
|
|
|
|
- DANIELI FACTORY PHASE II (2006) |
CSA + M & E |
|
|
|
|
- DANIELI FACTORY PHASE III (2007) |
CSA + M & E |
|
4,936.70 |
|
|
External Work of WS.3C, WS.7, GC, WS.5 / Additional Works, etc.) |
|
|
|
|
|
- GHC - HRM PROJECT , DUBI, UAE |
STRUCTURAL STEEL |
|
|
Fabrication for Structural Steel |
|
- JESCO PROJECT, SAUDL ARABIA |
STRUCTURAL STEEL |
|
|
Fabrication for Structural Steel |
|
- DANIELI FACTORY PHASE 4 PROJECT |
CSA + M & E |
|
|
Factory & Office Building |
|
- DANIELI FACTORY PHASE 2 : WORKSHOP 5A PROJECT |
CSA + M & E |
|
|
Factory & Office Building |
|
- SUPPLY OF FABRICATION AND PREASSEMBLING OF STEEL |
|
|
|
|
|
STRUCTURES FOR MELTSHOP BUILDING AND SCRAP YARD JOB NR. |
STRUCTURAL STEEL |
|
|
Fabrication for Structural Steel |
|
DP00XS FINAL DESTINATION KUWAIT |
|
|
|
|
- DANIEL FACTORY PHASE 2 : WORKSHOP 9A AND WORKSHOP 8 |
CSA + M & E |
|
13,848.00 |
Factory & Office Building |
|
PROJECT |
|
|
|
|
|
- GHC 2 - HRM PROJECT , DUBI, UAE |
STRUCTURAL STEEL |
|
|
Fabrication for Structural Steel |
36 |
GPO - MBP VACCINES PLANT PROJECT |
CSA |
|
- |
Human Vaccines Plant |
37 |
OHCT'S PLANT MODIFICATION # 1 - (UP GRADE BMI FACTORY) |
CSA |
|
- |
Factory Bldg. (Copper Tube Plant) |
38 |
KELLOGE CEREAL FACTORY |
CSA |
|
- |
Food Factory |
|
(Under Lend Lease (Thailand) Co., Ltd.) |
|
|
|
|
39 |
RHODIA ASPIRIN PACKAGING ROOM UPGRADE PROJECT |
CSA + M & E |
|
- |
Pharmaceutica Plant (Laboratory and Chemical |
|
|
|
|
|
Room) |
40 |
RESIN PLANT DYNEA KRABI |
CSA |
|
- |
Resin Plant |
41 |
I/F BUILDING EXPANSION, BANGPOO PLANT |
CSA + M & E |
|
- |
insecticide and fungicide building |
42 |
NEW FILM PLANT , POLYPLEX (THAILAND) LTD. |
Piling Work + CSA |
|
- |
Film Plant |
|
- NEW FILMPLANT , POLYPLEX (THAILAND) LTD. (PHASE
1) |
|
|
|
|
|
- NEW FILMPLANT , POLYPLEX (THAILAND) LTD. (PHASE
2) |
|
|
|
|
|
- FILM LINE 2 BUILDING & CHIP PLANT (Piling
Work) |
|
|
|
|
|
- CHIPS PLANT , POLYPLEX (THAILNAD) LTD. (PHASE 3) |
|
|
|
|
43 |
SARALAM T- LAMINATE BUILDING ECPANSION PROJECT |
CSA + M & E |
|
3,696.00 |
T- Laminate Factory |
44 |
NANYANG TEXTILE NEW FACTORY |
CSA |
|
- |
Factory & Office Building and Godown Building |
45 |
NANYANG GARMENT NEW FACTORY |
CSA |
|
9,508.00 |
Factory & Office Building |
46 |
PURAC QUINTEN PROJECT - P001 SITE PREPARATION WORK |
CSA + M & E |
|
- |
Factory Building |
47 |
KOLANG FACTORY PROJECT |
CSA + M & E |
|
- |
Factory & Office Building |
48 |
THANASARN CENTRAL STEEL NEW FACTORY AND OFFICE BUILDING |
CSA + M & E |
|
- |
Factory & Office Building (Turnkey Project) |
49 |
ARB OFF ROAD VEHICLE PART FACTORY PROJECT |
CSA + M & E |
|
6,972.00 |
Factory & Office Building (Turnkey Project) |
50 |
MHE - DEMAG NEW FACTORY PROJECT |
CSA + M & E |
|
7,858.20 |
Factory & Office Building |
51 |
TYTEX NEW FACTORY PROJECT |
CSA + M & E |
|
8,531.55 |
Factory & Office Building (Turnkey Project) |
52 |
CHOW STEEL FACTORY - EXPANSION PHASE 2 PROJECT |
CSA + M & E |
|
- |
Factory Building |
53 |
RONDA 925 NEW BUILDING EXPANSION PLANT PROJECT |
CSA + M & E |
|
- |
Factory & Office Building |
54 |
SCANIA NEW WORKSHOP PROJECT |
CSA |
|
5,049.08 |
Factory & Office Building |
55 |
SIRIKUL NEW FACTORY PROJECT |
CSA + M & E |
|
6,109.00 |
Factory Building |
56 |
ACUSHNET COMPANY BALL PLANT IV PROJECT |
CSA + M & E |
|
19,880.00 |
Factory & Office Building |
57 |
AAM THAILAND PROJECT |
CSA + M & E |
|
14,166.98 |
Factory & Office Building (Turnkey Project) |
58 |
PRIMUS INTERNATIONAL AEROSPACE MANUFACTURING FACILITY PROJECT |
CSA + M & E |
|
14,006.04 |
Factory & Office Building (Turnkey Project) |
59 |
PURAC EMERALD PROJECT |
CSA + M & E |
|
- |
Building & Civil Work |
60 |
DENA NEW FACTORY PROJECT |
CSA + M & E |
|
9,470.00 |
Factory & Office Building (Turnkey Project) |
61 |
DUCATI NEW FACTORY PROJECT |
CSA + M & E |
|
7,761.52 |
Factory & Office Building (Turnkey Project) |
62 |
PREUKSA PRECAST CONCRETE FACTORY 5 PROJECT (PCF 5) |
CSA |
|
14,285.00 |
Factory Building (PCF 5 for Precast Factory) |
63 |
FOOTJOY RENOVATION FACTORY PROJECT |
CSA |
|
1,401.84 |
Renovation Work for Factory Building (Turnkey Project) |
64 |
ALUCON NEW WAREHOUSE BUILDING NO.8 PROJECT |
CSA |
|
22,516.00 |
Factory Building |
65 |
F & N PROJECT PINDAH (F&N DAIRIES ' S NEW FACTORY ) |
|
|
|
|
| |
- PACKAGE NO.1 |
CSA + M & E |
|
46,550.00 |
Production Building |
| |
- PACKAGE NO.2 |
CSA + M & E |
|
11,380.00 |
Main Building Works |
66 |
NEW R&D BUILDING (HPC AND FOODS) PROJECT |
CSA + M & E |
|
13,500.00 |
Factory Building |
67 |
KNOR EXPANSION FOR JOK PROJECT |
CSA + M & E |
|
6,472.00 |
Factory Building |
68 |
MHE - DEMAG FACTORY (EXPANSION) PROJECT |
CSA + M & E |
|
4,181.00 |
Factory Building (Expansion) (Turnkey Project) |
69 |
S.SILP NEW FACTORY PROJECT |
CSA + M & E |
|
20,258.00 |
Factory Building |
70 |
SALSA FACTPRY PROJECT , ELECTROLUX THAILAND CO., LTD. |
|
|
|
|
|
- THE SUPPLY AND EXECUTE THE SITE PREPARATION WORK OF SALSA FACTORY PROJECT |
CSA + M & E |
|
31,793.00 |
Factory Building |
|
- THE SUPPLY AND EXECUTE THE BUILDING WORKS OF SALSA FACTORY PROJECT |
CSA + M & E |
|
|
Factory Building |
71 |
STARS MICROELECTRONICS NEW FACTORY (RENOVATION) |
CSA + M & E |
|
- |
Factory Building & Office Building (Renovation) |
72 |
F & N PROJECT PINDAH (F&N DAIRIES ' S NEW FACTORY ) PACKAGE 1 (RENOVATION) |
CSA + M & E |
|
- |
Production Building (Renovation) |
73 |
ACUSHNET COMPANY BALL PLANT IV - PHASE 2 PROJECT |
CSA + M & E |
|
- |
Factory Building - Phase 2 |
74 |
THAI HERRICK, RAYONG PLANT PROJECT |
CSA + M & E |
|
|
Factory Building |
75 |
NEW FILM LINE 10 AND CHIPS PLANT PROJECT |
CSA + M & E |
|
|
Film Plant |
|
- PEEL & STICK (P&S) PROJECT |
CSA + M & E |
|
|
|
| |
- SARALAM LINE 2 PROJECT |
CSA + M & E |
|
- |
|
76 |
TOZEN EXPANSION FACTORY PROJECT |
CSA + M & E |
|
- |
Factory Building ( Expansion ) |
77 |
DUCATI FACTORY - PHASE 2 PROJECT |
CSA + M & E |
|
- |
Factory Building - Phase 2 |
78 |
STRUCTURE UPGRADE FOR SOLAR ROOF PANEL PROJECT |
Structure Upgrade |
|
- |
Solar Roof Panel (Turnkey) |
| |
|
|
|
|
|
|
|
|
|
|
|
LOGISTIC & WAREHOUSE BUILDING |
|
|
|
|
|
|
|
|
1 |
P & G COSMO WAREHOUSE |
CSA |
|
22,000.00 |
Warehouse Bldg. (P&G Spec.) |
2 |
P & G PROJECT PLUS |
CSA |
|
15,000.00 |
Factory Bldg. & Warehouse (Consumer Product) |
3. |
THAI AUROMOTIVE SUPPLY CENTRE & THAI PETROCHEMICAL |
|
|
36,000.00 |
Logistic Center |
|
LOGISTIC CENTER |
|
|
|
|
|
- THAI AUTOMOTIVE SUPPLY CENTRE (PHASE 1)(NEW OFFICE) |
|
|
|
|
- THAI AUTOMOTIVE SUPPLY CENTRE (PHASE 2) |
CSA
|
|
4,900.00 |
Office Building |
|
- THAI AUTOMOTIVE SUPPLY CENTRE (PHASE 3) |
CSA |
|
|
Warehouse Building |
|
- THAI PETROCHEMICAL LOGISTIC CENTER (PHASE 5) |
CSA
|
|
Warehouse Building |
|
- THAI PETROCHEMICAL LOGISTIC CENTER (PHASE 6) |
CSA
|
|
Warehouse Building |
|
- KNT SILO PROJECT NO. 852 |
CSA
|
|
Warehouse Building |
4 |
CP SEVEN ELEVEN DISTRIBUTION CENTER |
CSA + M & E |
|
8,500.00 |
Warehouse Building |
5 |
T.C. PHARMACEUTICAL WAREHOUSE VI, PRACHINBURI |
CSA + M & E |
|
14,000.00 |
Redbull Factory Distribution Center |
6 |
T.C. PHARMACEUTICAL WAREHOUSE, PRACHINBURI (PHASE 2) |
CSA + M & E |
|
- |
Redbull Factory Distribution Center |
7 |
T.C. PHARMACEUTICAL WAREHOUSE, PRACHINBURI (NO.5) |
CSA + M & E |
|
|
Redbull Factory Distribution Center |
8 |
REDBULL DISTRIBUTION CENTER AT NAVANAKORN PATHUMTANEE |
Renovation CSA |
|
- |
Redbull Distriburion Center at Navanakorn |
9 |
REDBULL DISTRIBUTION CENTER AT UDONTHANI & KHONKAEN |
Renovation CSA |
|
- |
Redbull Distribution Center at Udonthani |
10 |
PERMCHAI PANICH OFFICE AND WAREHOUSE |
CSA + M & E |
|
- |
Warehouse Building |
11 |
PERMCHAI PANICH NEW WAREHOSUE PHASE 2 |
CSA |
|
- |
Warehouse Building |
12 |
SAGITTARIUS PROJECT (UNILEVER WAREHOUSE) |
CSA + M & E |
|
17,000.00 |
Warehouse Building |
13 |
ASIA METAL NEW GODOWN |
CSA |
|
- |
Warehouse Building |
14 |
KRUNGDHEP DOCUMENT WAREHOUSE PHASE 3 |
CSA |
|
- |
Warehouse Building |
15 |
NEW WAREHOUSE BN.6 |
CSA |
|
- |
Warehouse Building |
16 |
ROOF CANOPY AND MESSANINE FLOOR OFFICE FOR |
CSA |
|
- |
Warehouse Building |
|
LOADING AREA WAREHOUSE IDS LOGISTICS |
|
|
|
|
|
IDS LOGISTICS (THAILAND) LIMITED |
|
|
|
|
17 |
THRIVEN LOGISTIC CENTER, CHONBURI |
CSA |
|
20,472.00 |
Logistic Center (Turnkey Project) |
18 |
HEC - DKSH DISTRIBURION CENTER PROJECT PHASE 1 - 2 |
CSA + M & E |
|
34,472.50 |
Pharmacy Distribution Center With Air Condition |
|
|
|
|
|
and Cold Storage Room (Turnkey Project) |
19 |
TICON LAEMCHABANG LOGISTIC CENTER PHASE 2 PROJECT |
CSA + M & E |
|
- |
Logistic Center |
20 |
KAO NEW WAREHOUSE PROJECT |
CSA + M & E |
|
16,954.00 |
Warehouse Building |
21 |
DKSH HEC BANGNA - TRAD KM.20 PROJECT (3M PROJECT) |
CSA + M & E |
|
10,914.19 |
Warehouse Building |
22 |
KAO NEW WAREHOUSE PROJECT - PHASE 2 |
CSA + M & E |
|
18,576.00 |
Warehouse Building |
23 |
IDS LADKRABANG NEW DISTRIBUTION CENTER PROJECT |
CSA + M & E |
|
18,040.82 |
Warehouse Building (Turnkey Project) |
24 |
WASTE WATER TREATMENT TANK (UASB) PROJECT |
CSA |
|
- |
Redbull Factory Distribution Center |
| |
LOADING AREA FACTORY 4 PROJECT |
CSA |
|
|
Redbull Factory Distribution Center |
25 |
WHA MEGA LOGISTICS CENTER PROJECT |
CSA + M & E |
|
72,263.23 |
Logistic Center (Turnkey Project) |
|
BANGNA - TRAD KM.18 PROJECT |
|
|
|
|
26 |
WHA - DSG NEW WAREHOUSE PROJECT |
CSA + M & E |
|
42,962.58 |
Warehouse Building (Turnkey Project) |
|
AT HSIL, A.NONGKHAE, SARABURI PROVINCE |
|
|
|
|
27 |
KAO NEW WAREHOUSE PROJECT - PHASE 3, |
CSA + M & E |
|
206.67 |
Warehouse Building (Turnkey Project) |
| |
, CHONBURI PROVINCE |
|
|
|
|
28 |
WHA MEGA LOGISTICS CENTER PROJECT BANGNA - TRAD KM.19 PROJECT |
CSA + M & E |
|
- |
Logistic Center (Turnkey Project) |
|
- LINFOX COLD STORAGE PROJECT (BULD. N) |
- |
|
- |
Logistic Center (Turnkey Project) |
29 |
WHA - INTANON PHASE II PROJECT (3M PHASE 2) |
CSA + M & E |
|
- |
Logistic Center (Turnkey Project) |
30 |
DKSH HEALTHCARE EXTENSION PHASE 3 PROJECT |
CSA + M & E |
|
- |
Warehouse Building - Extension (Turnkey Project) |
31 |
WHA AAL NEW WAREHOUSE PROJECT |
CSA + M & E |
|
- |
Warehouse Building (Turnkey Project) |
32 |
WHA MEGA LOGISTICS CENTER BN23 PROJECT |
CSA + M & E |
|
- |
Warehouse Building (Turnkey Project) |
33 |
WHA AMATA NAKORN DISTRIBUTION CENTER PROJECT (MJN) |
CSA + M & E |
|
- |
Warehouse Building (Turnkey Project) |
34 |
WHA - DSGT DISTRIBUTION CENTER SARABURI PROJECT - PHASE 2 |
CSA + M & E |
|
- |
Warehouse Building (Turnkey Project) |
35 |
WHA AMATA NAKORN DISTRIBUTION CENTER PROJECT (BUILDING D) |
CSA + M & E |
|
- |
Warehouse Building (Turnkey Project) |
36 |
WHA - DSGT DISTRIBUTION CENTER PHASE 2 PROJECT - PRODUCTION EXPANSION WORKS |
CSA + M & E |
|
- |
Warehouse Building - Production Expansion Works (Turnkey Project) |
37 |
WHA LADKRABANG DISTRIBUTION CENTER PHASE 2 PROJECT (JJ Phase2) |
CSA + M & E |
|
- |
Warehouse Building (Turnkey Project) |
38 |
WHA MEGA LOGISTICS CENTER CHONLAHARNPICHIT KM. 4 PROJECT (80 RAIS) |
CSA + M & E |
|
- |
Warehouse Building (Turnkey Project) |
|
|
|
|
|
|
OFFICE & COMMERCIAL BUILDING |
|
|
|
|
|
|
1 |
DENNAKORN RESIDENCE |
CSA + M & E |
|
28,000.00 |
770 Units 3 Towers |
2 |
TT&T DORMITORY |
CSA + M & E |
|
- |
Training Center 5 Stories Bldg |
3 |
EKKNAKORN RESIDENCE |
CSA + M & E |
|
12,800.00 |
318 Units 2 Towers |
4 |
PNC BUILDING |
CSA |
|
- |
Office Bldg. 8 Stories |
5 |
PIMARN PARK HOTEL |
CSA + M & E |
|
- |
Hotel and Entertainment Complex |
6 |
APARTMENT , 2 TOWER , 440 UNIT |
CSA + M & E |
|
- |
Apartment Building |
7 |
PREMIUM OUTLET MALL CHA - AM |
CSA + M & E |
|
- |
Premium Outlet Mall |
8 |
PREMIUM OUTLET KHAO YAI |
CSA + M & E |
|
- |
Premium Outlet Mall |
9 |
OUTLET VILLAGE PATTAYA PROJECT |
CSA + M & E |
|
- |
Premium Outlet Mall |
10 |
OUTLET VILLAGE KRABI PROJECT |
CSA + M & E |
|
- |
Premium Outlet Mall |
11 |
HOMEPRO VILLAGE KHAO - YAI PROJECT |
CSA |
|
- |
Homepro Village |
12 |
HOMEPRO VILLAGE PHUKET PROJECT |
CSA |
|
- |
Homepro Village |
13 |
PREMIUM OUTLET MALL CHA - AM (EXTENSION) |
CSA + M & E |
|
- |
Premium Outlet Mall |
14 |
OUTLET VILLAGE PHUKET PROJECT |
CSA + M & E |
|
- |
Premium Outlet Mall |
15 |
OUTLET VILLAGE UDONTHANI PROJECT |
CSA + M & E |
|
- |
Premium Outlet Mall |
16 |
PREMIUM OUTLET MALL CHA AM (PHASE 2) PROJECT |
CSA + M & E |
|
2,009.00 |
Premium Outlet Mall |
17 |
S & J NEW OFFICE BUILDING PROJECT |
CSA + M & E |
|
5,580.00 |
Office Bldg. 7 Stories. |
18 |
HUA CHANG HOTEL PROJECT |
CSA + M & E |
|
12,151.00 |
Hotel |
19 |
PREMIUM OUTLET SANTORINI PARK CHA-AM PROJECT |
CSA + M & E |
|
58,078.00 |
Premium Outlet Mall |
20 |
PREMIUM OUTLET AYUTTHAYA PROJECT |
CSA + M & E |
|
30,000.00 |
Premium Outlet Mall |
21 |
B-GALLERY PROJECT |
CSA + M & E |
|
15,240.00 |
Shopping Mall |
22 |
COVER WALK WAY - OUTLET PHUKET PROJECT |
CSA |
|
- |
Cover Walkway |
23 |
SANTORINI WATER FANTAS PROJECT |
CSA + M & E |
|
- |
Paradise |
| |
|
|
|
|
|
COLD ROOM STORAGE BUILDING |
|
|
|
|
|
|
1 |
INVE'S NEW PRODUCTION FACILITIES |
CSA + M & E |
|
12,000.00 |
Factory Bldg. & Warehouse Include Blast Freezer, |
|
|
|
|
|
Cold Room and Cold Storage |
2 |
CHOMTHANA FACTORY PROJECT PHASE 2 |
CSA + M & E |
|
10,835.00 |
Factory Building & Warehouse Building |
|
|
|
|
|
( Cremo Ice-Cream Plant ) |
3 |
CRYSTAL FROZEN FOODS FACTORY |
CSA |
|
19,973.00 |
Food Factory (Export of Seafood) Including Cold |
|
|
|
|
|
Storage |
4 |
DRY STORE BUILDING AT WALL ICE CREAM PLANT (UNILEVER) |
CSA + M & E |
|
3,020.00 |
Warehouse Building (Export of Seafood) Including |
|
|
|
|
|
Cold Storage |
5 |
MARINE GOLD PRODUCTS NEW FACTORY |
CSA |
|
26,000.00 |
Food Factory (Export of Seafood) Including Cold |
|
|
|
|
Storage |
6 |
TICON COLD STORAGE PROJECT (MAKRO PROJECT) |
CSA + M & E |
|
11,545.00 |
Distribution Center (Cold Storage Room) |
|
|
|
|
|
(MAKRO PROJECT) (Turnkey Project) |
|
|
|
|
|
|
POWER PLANT COOLING TOWER |
|
|
|
|
|
|
1 |
EGAT SOUTH BANGKOK COOLING TOWER |
CSA + Equipment Installation
|
|
- |
Power Plant Cooling Tower |
2 |
COOLING TOWER AT NPS POWER PLANT |
CSA + Equipment Installation
|
|
- |
Power Plant Cooling Tower |
3 |
COOLING TOWER AT TRI ENERGY POWER PLANT |
CSA + Equipment Installation
|
|
- |
Power Plant Cooling Tower |
4 |
ALSTOM POWER PLANT - BANG BO (Cooling Tower) |
CSA + Equipment Installation
|
|
- |
Power Plant Cooling Tower |
5 |
DAN CHANG BIO ENERGY PROJECT MITR PHOL SUGAR |
CSA + Equipment Installation
|
|
- |
Power Plant Cooling Tower |
6 |
PHU KHIEO BIO ENERGY PROJECT MITR PHOL SUGAR |
CSA + Equipment Installation |
|
- |
Power Plant Cooling Tower |
|
|
|
|
|
|
|
|
|
|
|
|